Multi-Purpose Tower

Project Details
- Designed & built to API 4F
- Designed & built to DNV 2.7-3
- Ability to hydraulically stroke vertically and horizontally to better install or deploy string tools and position Coil Tubing Injector Head off or over well center
- 120K LB capacity
- Coiled Tubing / Wireline 30K
- On-board vertical hoist rated for 17K
- Jib crane rated for 2K
- Self-sufficient skidding system
- No rig down necessary and can skid tower from well to well via hydraulic clamps