Multi-Purpose Tower

image1 31

Project Details

  • Designed & built to API 4F
  • Designed & built to DNV 2.7-3
  • Ability to hydraulically stroke vertically and horizontally to better install or deploy string tools and position Coil Tubing Injector Head off or over well center
  • 120K LB capacity
  • Coiled Tubing / Wireline 30K
  • On-board vertical hoist rated for 17K
  • Jib crane rated for 2K
  • Self-sufficient skidding system
    • No rig down necessary and can skid tower from well to well via hydraulic clamps